More steel installed




Steel for the center section of the facility has been erected. Second photo is the training room and the third photo is the front entrance.


Construction Continues







Additional steel is being set, exterior and interior walls including the installation of sheetrock are underway.

Sunday, May 10, 2009

Trusses, backfill and stairs.

Trusses are installed above the Adult Services end of the building. The back fill is complete and footings started on the center section of the building. The staircase from the lower level is being installed.








Monday, May 4, 2009

Backfill continues and roof trusses begin



The backfill is almost complete behind the retaining wall and the the first trusses are being set in place with more continuing throughout the day.
The third picture is from the ADASP corner on the front of the building looking back through two groups rooms towards the adolescent area.
The fourth picture is from the adolescent area looking towards the front of the building. The beam at the top of this photo will support the air wall used to divide or join two groups rooms. The rectangle in middle of the photo is the structural support for the elevator. The hole in the floor just to the left in front of the rectangle will be the stairwell down to the lower level of the building.