Wednesday, May 27, 2009
Wednesday, May 13, 2009
Sunday, May 10, 2009
Monday, May 4, 2009
Backfill continues and roof trusses begin
The third picture is from the ADASP corner on the front of the building looking back through two groups rooms towards the adolescent area.
The fourth picture is from the adolescent area looking towards the front of the building. The beam at the top of this photo will support the air wall used to divide or join two groups rooms. The rectangle in middle of the photo is the structural support for the elevator. The hole in the floor just to the left in front of the rectangle will be the stairwell down to the lower level of the building.
Subscribe to:
Comments (Atom)

