Massive air handlers that will provide high air quality ventilation to the new building are being positioned for installation. The view from the street has changed significantly as all the steel and roof structure has been put into place. The finish roofing material is being installed with consideration for energy efficiency being given to the color and material to assist with lower energy costs. In the Adult Services end, the sub-ceiling drywall has been installed along with the main heating/ventilation/air conditioning (HVAC) trunk lines that will supply cool, warm and clean air throughout the building.
Monday, July 20, 2009
Subscribe to:
Comments (Atom)
