As construction continues, they are working on the sidewalks and remaining parking lot curbing, cabinets have been installed in the inpatient/detox area as well as the first coats of interior paint. Most of the exterior door frames and window casings have been installed.

The LEED processes continue as permanent power has been switched on to the lower level and the air handling units are being prepped for start up. In doing so, all return air vents are covered with a special filtration material to prevent containments from being pulled into the system. This will help maintain the indoor air quality required for the LEED program.